Skip to main content

Willits Unified School District

Gateway to the Redwoods

Maintenance & Operations Home

Summer Maintenance Projects

  • Single-story building with a maroon door, wooden ramp, and large window. Pile of wooden debris in front, under a clear blue sky.
  • A construction scene with a small digger on a sunny day, surrounded by broken concrete pieces. A person kneels nearby wearing a green helmet.
  • A person kneels on a floor, applying a blue border to a section of flooring.
  • A person kneels on a partially completed floor, applying adhesive for vinyl planks. The room appears under renovation with bare walls and new flooring.
  • Classroom with new gray flooring, blue cart with cleaning supplies, chalkboards, and colorful wall displays. Bright, organized, and tidy space.
  • A classroom with new gray laminate flooring. A cart with cleaning supplies is in the center. Unassembled furniture pieces and a small bin are scattered around.

WUSD Bond Projects

  • "Red wooden sign reads "Home of the Wolverines" with "Willits High" and a wolverine logo, under a digital date display."
  • "Willits High sign on Main St, displaying "Home of the Wolverines" with a digital board above. Trees and street in background."
  • "A sunny day at a school with a mural on the wall, empty parking spaces, and trees casting shadows on the building."
  • "A locker room with teal and gray lockers, a wooden bench, mirrors, and bright overhead lights on a gray floor."
  • "Room corner with white walls, green trim, and plastic-covered floor. Ceiling lights and a small vent are visible."
  • "A small room under renovation with tools, paint supplies, and a fan visible through a green-painted door frame."